Offshore industri
UMOE Anchor Contracting AS

Design and documentation of riser support Tray at Åsgaard

Client: UMOE Anchor Contracting AS
Project management for the EPC contract (FiReCo/NOM)

  • Geometrical design
  • Structural design of GRP tray
  • Material selection
  • FE-analysis of GRP parts and interfaces
  • Design reports
  • Design drawings
  • Production drawings
  • Production procedures
  • Testing and documentation

gul1

Trays designed by FiReCo to support risers from sub sea wellheads to surface

3dgul
3D FE-Model of RSS for Gas Export buoy

 

3dfarger
Deformation plot from FE analysis

graf

Non-linear response – load – deformation of points on the structure (from geometric non linear analysis)

pdf-icon To download the pdf file click on the symbol